国家

全局标志图标
全球
阿尔巴尼亚国旗图标
阿尔巴尼亚
巴西国旗图标
巴西
智利国旗图标
智利
克罗地亚国旗图标
克罗地亚
芬兰国旗图标
芬兰
法国国旗图标
法国
德国国旗图标
德国
印度国旗图标
印度
爱尔兰国旗图标
爱尔兰
意大利国旗图标
意大利
尼泊尔国旗图标
尼泊尔
荷兰 flag icon
荷兰
挪威国旗图标
挪威
秘鲁国旗图标
秘鲁
波兰国旗图标
波兰
葡萄牙国旗图标
葡萄牙
西班牙国旗图标
西班牙
瑞典国旗图标
瑞典
rkiye国旗图标
Turkiye
联合王国 flag icon
联合王国
美国 flag icon
美国
  • 2016
    Entered into operation
  • 72 MW
    Installed capacity
  • 255妇女和
    年生产

Banja hydropower plant started commercial operations in Autumn 2016 as the first plant to be completed by Devoll 水电 Sh.A. (DHP), an 阿尔巴尼亚n-registered company, owned and operated by mg游戏官方网站.

Devoll 水电 builds, owns and operates hydropower plants in cascade along the Devoll River in southeast 阿尔巴尼亚, based on a concession agreement signed between mg游戏官方网站 and the Government of 阿尔巴尼亚.

Banja hydropower plant consists of an embankment dam with an impervious clay core approximately 80 metres high. The plant is equipped with two large Francis turbine units and one small Francis turbine unit and has an installed capacity of approximately 72 MW. The average annual production is approximately 255妇女和.

The plant utilises a head between 175 and 95 metres above sea level. At its highest regulated water level of 175 metres above sea level, the reservoir has a surface area of approximately 14 square kilometres and a storage capacity of 400 million cubic metres.

Banja hydropower plant is part of the Devoll 水电 Project which consists of development, 规划, construction and operation of the power plants Banja and Moglicë, with a total installed capacity of approximately 269 MW and a planned annual production of approximately 700 GWh.

The concession agreement also includes an option for a third hydropower plant, Kokel.

公司 所有权份额
mg游戏官方网站 100%
  • Banja hydropower plant
    阿尔巴尼亚
    Artan Figu

    Banja hydropower plant

  • Banja hydropower plant
    阿尔巴尼亚
    爱德华·Pagrja

    Banja hydropower plant

  • The reservoir at Banja hydropower plant
    阿尔巴尼亚
    爱德华·Pagrja

    The reservoir at Banja hydropower plant

Find out more about our activities in 阿尔巴尼亚